A newly revised proposal for 808 Mt Pleasant Road is set to redefine the skyline of Midtown Toronto. Designed by Sweeny &Co Architects for Reserve Properties and Westdale Properties, this 61-storey condominium project marks a significant leap in height and density from its earlier versions.
The tower, situated within a Protected Major Transit Station Area (PMTSA), highlights Toronto’s growing commitment to transit-oriented development. Here’s a detailed look at the construction and design plans, with a focus on elements relevant to workers in the construction field.
Height: 61 storeys (204.55m)
Location: 808 Mt Pleasant Road, at the southwest corner of Mt Pleasant and Roehampton Avenue
Gross Floor Area (GFA): 49,853m² (49,041m² residential, 812m² retail/non-residential)
Unit Count: 896 residential units
Parking: Two underground levels with 64 spaces
Bicycle Parking: 988 spaces (808 long-term, 180 short-term)
Completion Timeline: TBD, subject to city approvals
Residential Units: 896 units nearly double the 457-unit count in the 2017 proposal and exceed the 514 units approved in 2021.
Retail and Community Spaces:
812m² Retail GFA: Includes storefronts fronting Mt Pleasant Road.
471.6m² EarlyON Child and Family Centre: Serves local families.
Public Parkland Dedication: 317m² park facing Roehampton Avenue.
Outdoor Amenities: 679m² on the 7th floor.
Total Amenity Space: 2,125m², a notable increase from earlier plans.
Vehicle Parking: Two underground levels with 64 spaces (49 for residents, 12 for visitors, 1 car share, and 2 drop-off spots).
Bicycle Parking: 988 spaces, more than double the 464 spaces proposed in 2017.
Proximity to Transit:
Mount Pleasant Station on Eglinton Line 5 Crosstown LRT is directly south.
Eglinton Station on Line 1 Yonge-University is just one stop west.
Multiple bus stops and cycling lanes enhance connectivity.
Height and Structural Demands:
Advanced engineering needed for a towering height of 204.55m.
Foundation work must support the structure with only two underground levels.
Six elevators servicing 896 units.
Sustainability and Efficiency:
Reduced parking levels cut excavation time and environmental impact.
Public parkland enhances the area’s livability.
Demolition and Site Prep:
Vacant 10-storey Best Western Roehampton Hotel to be demolished.
Two-storey homes on Roehampton Avenue to be removed.
Surface parking lot to be cleared and remediated.
Job Opportunities:
Demolition and site remediation during early phases.
Structural and concrete work for high-rise construction.
HVAC and elevator installation for the building’s advanced systems.
Cycling Infrastructure:
Significant work on creating secure and user-friendly bicycle parking.
The proposed 61-storey tower at 808 Mt Pleasant Road is a bold move in transit-oriented development for Midtown Toronto. Doubling residential capacity from earlier plans and emphasizing sustainable design, it aligns with Toronto’s vision for high-density growth. For construction workers, this project promises steady employment across various trades. Upon completion, the tower will stand as a testament to innovation and sustainable urban growth in Toronto.