61 Storey Condo Development Proposed in Midtown Toronto

61 Storey Condo Development Proposed in Midtown Toronto

A newly revised proposal for 808 Mt Pleasant Road is set to redefine the skyline of Midtown Toronto. Designed by Sweeny &Co Architects for Reserve Properties and Westdale Properties, this 61-storey condominium project marks a significant leap in height and density from its earlier versions.

The tower, situated within a Protected Major Transit Station Area (PMTSA), highlights Toronto’s growing commitment to transit-oriented development. Here’s a detailed look at the construction and design plans, with a focus on elements relevant to workers in the construction field.

 

Project Overview

  • Height: 61 storeys (204.55m)

  • Location: 808 Mt Pleasant Road, at the southwest corner of Mt Pleasant and Roehampton Avenue

  • Gross Floor Area (GFA): 49,853m² (49,041m² residential, 812m² retail/non-residential)

  • Unit Count: 896 residential units

  • Parking: Two underground levels with 64 spaces

  • Bicycle Parking: 988 spaces (808 long-term, 180 short-term)

  • Completion Timeline: TBD, subject to city approvals

Key Design Features

  • Residential Units: 896 units nearly double the 457-unit count in the 2017 proposal and exceed the 514 units approved in 2021.

  • Retail and Community Spaces:

    • 812m² Retail GFA: Includes storefronts fronting Mt Pleasant Road.

    • 471.6m² EarlyON Child and Family Centre: Serves local families.

    • Public Parkland Dedication: 317m² park facing Roehampton Avenue.

    • Amenity Spaces
  • Indoor Amenities: 1,446m² on the mezzanine and 7th floors.
    • Outdoor Amenities: 679m² on the 7th floor.

    • Total Amenity Space: 2,125m², a notable increase from earlier plans.

  • Transportation and Accessibility
  • Vehicle Parking: Two underground levels with 64 spaces (49 for residents, 12 for visitors, 1 car share, and 2 drop-off spots).

  • Bicycle Parking: 988 spaces, more than double the 464 spaces proposed in 2017.

  • Proximity to Transit:

    • Mount Pleasant Station on Eglinton Line 5 Crosstown LRT is directly south.

    • Eglinton Station on Line 1 Yonge-University is just one stop west.

    • Multiple bus stops and cycling lanes enhance connectivity.

Construction-Specific Highlights

  • Height and Structural Demands:

    • Advanced engineering needed for a towering height of 204.55m.

    • Foundation work must support the structure with only two underground levels.

    • Six elevators servicing 896 units.

  • Sustainability and Efficiency:

    • Reduced parking levels cut excavation time and environmental impact.

    • Public parkland enhances the area’s livability.

  • Demolition and Site Prep:

    • Vacant 10-storey Best Western Roehampton Hotel to be demolished.

    • Two-storey homes on Roehampton Avenue to be removed.

    • Surface parking lot to be cleared and remediated.


    Looking for Mixed Use Projects in Ontario?

 

Implications for Construction Workers

  • Job Opportunities:

    • Demolition and site remediation during early phases.

    • Structural and concrete work for high-rise construction.

    • HVAC and elevator installation for the building’s advanced systems.

  • Cycling Infrastructure:

    • Significant work on creating secure and user-friendly bicycle parking.

The proposed 61-storey tower at 808 Mt Pleasant Road is a bold move in transit-oriented development for Midtown Toronto. Doubling residential capacity from earlier plans and emphasizing sustainable design, it aligns with Toronto’s vision for high-density growth. For construction workers, this project promises steady employment across various trades. Upon completion, the tower will stand as a testament to innovation and sustainable urban growth in Toronto.

 

TradeTraks Banner

 

Posted by Judy Lamelza

Need the details on a specific Project or Company?
 
See how DataBid can help your company find projects and increase your odds of winning.

 

TRY DATABID TODAY

New call-to-action
Office Hotel Mixed-Use Projects 1080x1920