A newly revised proposal for 808 Mt Pleasant Road is set to redefine the skyline of Midtown Toronto. Designed by Sweeny &Co Architects for Reserve Properties and Westdale Properties, this 61-storey condominium project marks a significant leap in height and density from its earlier versions.
The tower, situated within a Protected Major Transit Station Area (PMTSA), highlights Toronto’s growing commitment to transit-oriented development. Here’s a detailed look at the construction and design plans, with a focus on elements relevant to workers in the construction field.
Project Overview
-
Height: 61 storeys (204.55m)
-
Location: 808 Mt Pleasant Road, at the southwest corner of Mt Pleasant and Roehampton Avenue
-
Gross Floor Area (GFA): 49,853m² (49,041m² residential, 812m² retail/non-residential)
-
Unit Count: 896 residential units
-
Parking: Two underground levels with 64 spaces
-
Bicycle Parking: 988 spaces (808 long-term, 180 short-term)
-
Completion Timeline: TBD, subject to city approvals
Key Design Features
-
Residential Units: 896 units nearly double the 457-unit count in the 2017 proposal and exceed the 514 units approved in 2021.
-
Retail and Community Spaces:
-
812m² Retail GFA: Includes storefronts fronting Mt Pleasant Road.
-
471.6m² EarlyON Child and Family Centre: Serves local families.
-
Public Parkland Dedication: 317m² park facing Roehampton Avenue.
- Amenity Spaces
-
- Indoor Amenities: 1,446m² on the mezzanine and 7th floors.
-
Outdoor Amenities: 679m² on the 7th floor.
-
Total Amenity Space: 2,125m², a notable increase from earlier plans.
-
- Transportation and Accessibility
-
Vehicle Parking: Two underground levels with 64 spaces (49 for residents, 12 for visitors, 1 car share, and 2 drop-off spots).
-
Bicycle Parking: 988 spaces, more than double the 464 spaces proposed in 2017.
-
Proximity to Transit:
-
Mount Pleasant Station on Eglinton Line 5 Crosstown LRT is directly south.
-
Eglinton Station on Line 1 Yonge-University is just one stop west.
-
Multiple bus stops and cycling lanes enhance connectivity.
-
Construction-Specific Highlights
-
Height and Structural Demands:
-
Advanced engineering needed for a towering height of 204.55m.
-
Foundation work must support the structure with only two underground levels.
-
Six elevators servicing 896 units.
-
-
Sustainability and Efficiency:
-
Reduced parking levels cut excavation time and environmental impact.
-
Public parkland enhances the area’s livability.
-
-
Demolition and Site Prep:
-
Vacant 10-storey Best Western Roehampton Hotel to be demolished.
-
Two-storey homes on Roehampton Avenue to be removed.
-
Surface parking lot to be cleared and remediated.
-
Implications for Construction Workers
-
Job Opportunities:
-
Demolition and site remediation during early phases.
-
Structural and concrete work for high-rise construction.
-
HVAC and elevator installation for the building’s advanced systems.
-
-
Cycling Infrastructure:
-
Significant work on creating secure and user-friendly bicycle parking.
-
The proposed 61-storey tower at 808 Mt Pleasant Road is a bold move in transit-oriented development for Midtown Toronto. Doubling residential capacity from earlier plans and emphasizing sustainable design, it aligns with Toronto’s vision for high-density growth. For construction workers, this project promises steady employment across various trades. Upon completion, the tower will stand as a testament to innovation and sustainable urban growth in Toronto.
Posted by Judy Lamelza