The Dawes is a new two-tower condo development from Marlin Spring that will be coming to Danforth Village. The two towers will be connected by a podium at the six-storey level.
Livable_ by BuzzBuzzHome states that The Dawes will offer the last chance to get in on the ground floor of a neighbourhood on the rise. The project will include the following:
- Contain 631 suites
- South Tower will be 38 storeys
- North Tower will be 24 storeys
- Connected by a podium with retail
- 27,000 square feet of indoor and outdoor space dedicated to residents' needs
- Amenities will be spread out over first, third, fourth, fifth and seventh floors
- Two storey fitness studio
- Wellness centre with exercise, cardio and weight training areas
- Art studio
- Pet wash
- Meeting room for work projects
- Co-working lounge
- Library lounge
- Screening Room
- Indoor dining area
- Indoor kids' area
- Social lounge
- Gaming room
- Outdoor dining area
- Outdoor kids' play area
- Outdoor BBQ and lounge
An article in Urban Toronto states that while the new mixed-use development will host office and retail spaces in its podium, it will also have a renovated 1906-built grain elevator and mill that will house a new daycare facility.
The IBI Group-designed development will feature suites with 9 foot ceilings and laminate flooring. It will also have a U31-designed lobby which will offer 24 hour concierge service next to a mail and parcel room.
Unique to The Dawes is its heritage, 3 storey, 1906 grain elevator and mill at 10 Dawes Road, a renovation which will incorporate it into the overall development and turn it into a brand new daycare facility just steps from the front doors.
The Main Street subway station will be a block away and the new east entrance to Danforth GO station will be even closer and will make it very easy to get to the downtown core.
Posted by Judy Lamelza