Infrastructure Projects Underway in Grundy County

Infrastructure Projects Underway in Grundy County

Grundy County is set for a major transformation with significant construction projects scheduled as part of Governor JB Pritzker’s Rebuild Illinois Capital program. These initiatives aim to enhance infrastructure, improve safety, and stimulate local economic growth. Below is a detailed look at each of the projects, focusing on the specific construction and design elements of interest to workers in the field.

 

1. I-80 Bridge Replacement Over the Des Plaines River

Details:

 

 - Scope: Complete bridge replacement

 - Completion: 2026

 - Key Activities:

    • Demolition of the existing bridge
    • Installation of new foundations and steel frameworks
    • Concrete decking and modern safety features

2. Route 47 Expansion from I-80 to Reed Road

Details:

 

 - Scope: Widening the roadway

 - Completion: 2025

 - Key Activities:

    • Excavation and grading
    • New asphalt paving
    • Upgraded drainage systems
    • Modernized traffic signals

3. Downtown Morris Streetscape Enhancement

Details:

 

 - Scope: Streetscape improvements

 - Completion: 2024 

 - Key Activities

    • Sidewalk widening and repaving
    • New street lighting
    • Landscaping with trees and plants
    • Installation of public furniture such as benches and bike racks

4. Route 6 Resurfacing from Morris to Channahon

Details:

 

 - Scope: Resurfacing and minor repairs 

 - Completion: 2024

 - Key Activities:

    • Milling of old asphalt
    • Application of new asphalt layer
    • Shoulder repairs and signage upgrades

5. Seneca Interchange Improvements at I-80

Details:

 

 - Scope: Interchange capacity and safety enhancements

 - Completion: 2025

 - Key Activities:

    • Reconstruction of ramps
    • Addition of new lanes
    • Installation of traffic signals
    • Improved drainage systems

6. Grundy County Bridge Maintenance

Details:

 

 - Scope: Maintenance and repair of various bridges

 - Completion: 2024

 - Key Activities:

    • Structural assessments
    • Reinforcement work
    • Deck repairs and protective coatings

7. Route 113 Reconstruction in Coal City

Details:

 

 - Scope: Complete reconstruction of Route 113

 - Completion: 2024 

 - Key Activities:

    • Full-depth pavement reconstruction
    • New stormwater management systems
    • Sidewalk installation and lighting improvements

8. Route 129 Realignment in Braidwood

Details:

 

 - Scope: Realigning Route 129

 - Completion: 2025

 - Key Activities:

    • Road realignment
    • New intersections
    • Drainage system improvements

9. Canal Road Bridge Replacement

Details:

 

 - Scope: Replacing the Canal Road Bridge

 - Completion: 2024

 - Key Activities:

    • Demolition of the old bridge
    • Construction of a new bridge
    • Enhanced safety features

10. Gardner Road Extension

Details:

 

 - Scope: Extending Gardner Road

 - Completion: 2024

 - Key Activities:

    • Road extension
    • New pavement and drainage
    • Intersection improvements

11. Illinois River Drive Widening

Details:

 

 - Scope: Widening Illinois River Drive

 - Completion: 2025

 - Key Activities:

    • Pavement widening
    • Enhanced drainage systems
    • Traffic management upgrades

12. Route 53 Signal Modernization

Details:

 

 - Scope: Modernizing traffic signals along Route 53

 - Completion: 2024

 - Key Activities:

    • Replacing outdated traffic signals
    • Installing advanced signal control system

13. New Pedestrian Bridge in Minooka

Details:

 

 - Scope: Constructing a new pedestrian bridge

 - Completion: 2024

 - Key Activities:

    • Foundation work
    • Erecting the bridge structure
    • Landscaping and accessibility improvements

14. Route 59 Intersection Improvement in Shorewood

Details:

 

 - Scope: Improving the intersection at Route 59

 - Completion: 2025

 - Key Activities:

    • Road widening
    • New traffic signals
    • Enhanced pedestrian crossings

15. Route 71 Curve Correction in Norway

Details:

 

 - Scope: Correcting dangerous curves on Route 71

 - Completion: 2024

 - Key Activities:

    • Road realignment
    • New safety barriers

WCSJ News reports that these projects will significantly enhance local infrastructure, supporting economic growth and community engagement:

 

  • Transportation Improvements: Making travel safer and more efficient.
  • Economic Boost: Attracting new businesses and residents.
  • Community Enhancement: Creating pedestrian-friendly and visually appealing spaces.

Grundy County’s construction projects under the Rebuild Illinois Capital program represent a significant investment in the area’s future. These projects offer construction workers a chance to engage with innovative techniques and sustainable practices, while contributing to the local community’s development.

 

Illinois Project Leads Ad 728x90

 

Posted by Judy Lamelza

Need the details on a specific Project or Company?
 
See how DataBid can help your company find projects and increase your odds of winning.

 

TRY DATABID TODAY

Infrastructure Projects 336x280