Blog | Databid

Expansion Plans for Education Center in Red Bud IL

Written by Judy Lamelza | Aug 22, 2024 2:16:44 PM

Southwestern Illinois College (SWIC) is set to enhance its educational offerings with the construction of a new $5.5 million building at its Red Bud campus. This project is part of a broader effort to expand career training programs and provide state-of-the-art facilities for students. In this blog, we will delve into the construction and design details of this significant development, focusing on elements that are particularly relevant to workers in the construction field. 

 

Project Overview

 

Key Details:

  • Location: Red Bud Campus, Southwestern Illinois College, Red Bud, Illinois
  • Total Project Cost: $5.5 million
  • Primary Focus: Expansion of career training programs
  • Project Size: 7,800 Square foot stand-alone building
  • Expected Completion: 2025

 

“SWIC and other community colleges are the dynamic institutions that are capable of building the workforce of the future, creating opportunities for hardworking Illinoisans and maximizing economic growth potential for the entire state, and particularly for this region."

Governor of Illinois | Governor JB Pritzker

 

Itemized Breakdown of Project Features

 

1. Career Training Facilities

  • Details: The new building will primarily serve as a hub for career training programs, specifically focusing on trades such as welding, industrial electricity, and precision machining. These programs are designed to meet the growing demand for skilled workers in these fields, particularly in the local manufacturing and construction industries. The facility will include specialized labs and classrooms equipped with the latest technology to provide hands-on training.

2. Modern Classrooms and Labs

  • Details: The construction of this new facility will include state-of-the-art classrooms and laboratories. These spaces are tailored to provide an interactive learning environment, where students can engage with modern equipment and technology that mirrors what they will encounter in the workforce. The labs will be outfitted with advanced machinery and tools necessary for trades such as welding and precision machining, ensuring that students receive practical, industry-relevant training.

3. Sustainable Design Elements

  • Details: The building's design incorporates several sustainable elements aimed at minimizing its environmental impact. Although specific details about sustainability measures were not extensively covered in the provided sources, it is likely that the construction will adhere to energy-efficient building practices, a common trend in modern educational facility development. This could include features such as energy-efficient HVAC systems, LED lighting, and possibly the use of sustainable building materials.

4. Enhanced Campus Infrastructure

  • Details: The new building will also improve the overall infrastructure of the Red Bud campus. By expanding the physical footprint of the campus, SWIC is making a significant investment in the future of its students and the local community. The enhanced infrastructure will support not only current students but also future growth, as the demand for skilled labor continues to rise. This expansion aligns with the college’s long-term strategic plan to enhance its educational offerings and attract more students to its career training programs.

 

Construction Focus and Challenges

 

Coordination with Ongoing Campus Activities

One of the primary challenges of this construction project will be coordinating the building work with ongoing campus activities. As the new facility is being built on an active college campus, construction teams will need to minimize disruptions to students and faculty. This will likely involve strategic planning to schedule noisy or disruptive work during off-peak hours or between academic terms.

 

Job Creation and Workforce Opportunities

Belleville News reports that the construction of the new building is expected to create job opportunities for local construction workers and tradespeople. The board of trustees has approved contracts with Farnsworth Group for architectural services and Holland Construction Services for preconstruction work.

The project will require a diverse range of skills, from general construction to specialized trades such as electrical work and welding. For workers in the construction field, this project presents an opportunity to contribute to a significant educational development that will have a lasting impact on the local community.

 

The construction of the new $5.5 million building at Southwestern Illinois College’s Red Bud campus is a significant step forward in expanding the college’s career training programs. With a focus on trades that are in high demand, this project will provide state-of-the-art facilities for students and create job opportunities for workers in the construction field. As the project progresses, it will serve as a model for how educational institutions can invest in their infrastructure to better serve their students and the broader community. For construction workers, this project offers the chance to be part of a transformative development that will shape the future of vocational education in the region.