Blog | Databid

Exhibition Place Hotel Expansion

Written by Judy Lamelza | Mar 2, 2026 2:44:13 PM

Toronto’s Exhibition Place is set to undergo another major transformation as new plans advance for a second-phase hotel tower and adjoining event venue. The proposed development builds on the success of the existing Hotel X and represents a significant step in expanding the site’s hospitality and entertainment infrastructure.

New planning documents filed with the City of Toronto in early 2026 outline a revised vision for the long-anticipated project. The proposal introduces a 32-storey hotel tower alongside a redesigned event venue, reshaping how the site will support large gatherings and tourism activity in the years ahead.

Evolution of the Design

BlogTo reports that the project has undergone multiple revisions since it was first introduced nearly five years ago. Initial plans revealed in 2021 featured a futuristic venue concept designed to host esports events. That version included sweeping architectural curves and a large capacity stadium space.

In 2022, a revised and scaled-back concept was introduced. By 2024, further design changes were made, and later that year the project experienced a seven-year delay that cast uncertainty over its future.

The latest 2026 submission reflects a refined approach that aligns more closely with evolving operational needs and construction feasibility. The hotel tower height has increased from previous proposals, while the event venue’s capacity has been reduced from 7,000 seats to approximately 5,000.

32-Storey Hotel Tower Design

The updated hotel component proposes a 32-storey structure containing 370 suites. The building will serve as an expansion of Exhibition Place’s hospitality offering and complement the existing Hotel X.

From a construction perspective, a tower of this height introduces complex structural and mechanical requirements. High-rise hotel construction typically involves:

  • Reinforced concrete core systems
  • Structural framing designed for wind loads
  • Vertical transportation infrastructure
  • Fire protection systems
  • Mechanical and electrical distribution across multiple floors

Integration with the existing Exhibition Place infrastructure will also require coordination of utilities, access routes, and service systems.

Event Venue Redesign

The associated event venue has also undergone substantial design evolution. Earlier concepts emphasized curved architectural forms, but the latest iteration adopts a more angular and faceted design language.

The redesign was led by architecture firm Populous, known for large-scale venue development worldwide. Moving to a more geometric form can simplify structural systems while maintaining visual impact.

The revised 5,000-seat capacity supports a range of programming while improving construction efficiency. Venue construction will involve:

  • Long-span structural systems
  • Acoustic wall assemblies
  • Tiered seating structures
  • Stage and performance infrastructure
  • Back-of-house service spaces

Mechanical ventilation and lighting systems must be integrated into the venue design to support varied uses and event types.

Site Integration and Supporting Infrastructure

The development sits within a rapidly evolving entertainment district. Nearby projects include the expansion of BMO Field and broader redevelopment activity at Ontario Place.

Constructing a new tower and venue within this active urban setting requires careful sequencing of site work, including:

  • Utility coordination
  • Foundation systems
  • Structural integration
  • Pedestrian circulation planning

These elements are essential to maintaining operational continuity across Exhibition Place while construction progresses.

Construction Trades Involved

Delivering a hotel tower and large event venue of this scale requires a wide range of skilled trades, including:

  • Site preparation and excavation crews
  • Concrete formwork and structural contractors
  • Steel fabrication and erection teams
  • Masonry and façade installers
  • Roofing and waterproofing specialists
  • Mechanical and HVAC contractors
  • Electrical and lighting technicians
  • Fire protection installers
  • Elevator contractors
  • Interior finishing trades
  • Seating and stage installation specialists
  • Acoustic system installers

Phased Development Outlook

The new hotel and venue will complement Exhibition Place’s evolving role as a destination for large events and gatherings. By aligning with surrounding infrastructure improvements, the project strengthens the long-term development framework for the site.

With updated planning documents now submitted, the project moves closer to permitting and construction readiness. The latest revisions signal a renewed commitment to delivering a high-rise hospitality tower alongside a modern event venue designed for flexible programming.

As planning advances, the development stands poised to add new capacity and functionality to one of Toronto’s most recognizable event locations.