Blog | Databid

$7 Billion Development to Reshape Chicago's West Side

Written by Judy Lamelza | Sep 6, 2024 1:05:42 PM

The $7 billion United Center campus redevelopment, known as the "1901 Project," aims to transform Chicago’s West Side into a mixed-use hub that will include housing, entertainment, and commercial spaces. The plan, backed by Jerry Reinsdorf of the Chicago Bulls and Rocky Wirtz of the Chicago Blackhawks, is a response to the growing need for community-focused development in the area surrounding the United Center. With its focus on revitalizing the neighborhood, this project will create significant construction opportunities and have a substantial impact on local workers.

 

Project Overview

 

The 1901 Project derives its name from the address of the United Center—1901 West Madison Street. It will span several phases and encompass residential, retail, entertainment, and green space, fundamentally reshaping the West Side. By making the area around the United Center a destination in its own right, the development will aim to balance the needs of residents, workers, and visitors.

The initial phase of construction will take place on surface parking lots adjacent to the arena and feature, according to the release:

  • A 6,000-seat capacity theater-style music hall, designed to attract music, arts and cultural events.
  • An elevated park integrated on the west side of the campus, which will provide more than 10 acres of public recreational and community gathering space.
  • Reimagined parking facilities and improved pedestrian experience with enhanced walkability, lighting, roads and bike lanes designed to blend into the development.
  • A mix of hospitality and retail options aimed at boosting local commerce and creating jobs.

 

1. Mixed-Use Development

The project’s most prominent feature is its mixed-use design. According to reports, the 1901 Project will feature a combination of residential units, retail stores, restaurants, and office spaces. This integration of housing and commercial space is expected to increase foot traffic and provide ample job opportunities for construction workers across multiple trades. The construction will be phased, with different types of buildings being erected simultaneously to ensure that both residential and commercial demands are met.

2. Housing and Affordability

One of the key elements of the plan is the inclusion of affordable housing units. Reports indicate that a mix of market-rate and affordable housing will be incorporated into the development to meet the needs of the local community. Specific details regarding the number of housing units and affordability guidelines are still being finalized, but the focus on diverse housing options will require extensive residential construction work.

3. Music and Entertainment Venues

The United Center is already a cornerstone of Chicago’s entertainment scene, and the 1901 Project will enhance this further by including a new music venue. This will be a standalone facility that caters to a wide array of performances, from concerts to other live events. The construction of such a venue will likely involve specialized design and acoustical engineering, providing skilled labor opportunities in those areas.

4. Community and Green Spaces

To ensure that the development blends well with the local community, the 1901 Project will include public green spaces. This aligns with the growing trend in urban development that emphasizes sustainable and accessible outdoor areas. Landscapers, urban planners, and environmental engineers will be integral to the successful completion of these community spaces. This aspect of the development will provide spaces for public recreation and relaxation, making the area around the United Center more inviting for both locals and visitors.

 

Construction Workforce Impact

 

Construction Dive reports that the scale of the 1901 Project presents a significant opportunity for construction workers. From general laborers to skilled trades such as electricians, carpenters, and plumbers, the project will demand a wide range of professionals. With a timeline stretching over several years, it promises sustained employment for local workers, many of whom will benefit from the proximity of the site to the West Side communities.

In addition, the project’s focus on green spaces and public amenities will require the expertise of environmental engineers and landscape architects. Construction companies may also need to recruit specialists in sustainable building practices, as eco-friendly design features are expected to play a role in the new development.

 

Timeline and Phasing

 

While the project has secured approval and financing, full construction is anticipated to begin gradually, with various phases rolled out over time. Initial phases will likely focus on residential and commercial development, while later phases will introduce entertainment venues and public spaces. The overall construction timeline could span up to a decade, with some parts completed earlier depending on market conditions and community needs.

 

The United Center’s 1901 Project is a monumental undertaking that will reshape the West Side of Chicago, bringing a variety of new developments ranging from housing to entertainment. For construction workers, this is an exciting opportunity to be part of a high-profile project that will create lasting change in a historic part of the city. With the construction timeline expected to last several years, the project will provide continuous employment and opportunities for specialization in various aspects of modern, mixed-use developments. Ultimately, the 1901 Project will be a transformative development that balances economic growth with community needs.

 

DataBid is currently reporting on this project - 1901 Project Mixed Use Redevelopment United Center West Side - Chicago  (0018072924)