28 Storey Development Proposed in Church-Wellesley Village

28 Storey Development Proposed in Church-Wellesley Village2

In the heart of Toronto, the proposed development at 68 Wellesley Street East by KingSett Capital, with its cutting-edge design by BDP Quadrangle, signifies a pivotal moment in the neighborhood's evolution. This 28-storey mixed-use tower is not just a building; it's a bold statement of modern living, community engagement, and architectural reverence, seamlessly blending residential, commercial, and community spaces.

 

Architectural Innovation and Urban Design

The project's cornerstone is the preservation of William McBean Terrace, a heritage gem dating back to 1878. This initiative underscores the intricate balance between celebrating history and embracing the future. By maintaining the facade and integrating it into the new tower's base, the development pays homage to the Village's architectural lineage while introducing a modern residential and commercial hub. The historic features will remain “iconic elements” of the design, helping blend the modernity of the new structure with the character of the surrounding streets.

Storeys reports that the design aims to invigorate the streetscape with 388m² of retail space, promising an enhanced pedestrian experience. Incorporating a 232m² community space for the adjacent 519 Community Hub into the second floor amplifies the project's commitment to enriching the neighborhood's cultural and social fabric, fostering a sense of belonging and community engagement.

Looking for Mixed Use Projects in Ontario?

 

A three-storey, metal-panelled base will sit atop the heritage building, its copper colour matching the new street-level frontage. The crisp white tower will be balanced above, its curved balconies creating a wave-like effect above the iconic corner.

The building will feature the following:

 

 - 17,523.3 sq. m total gross floor area

 - 16,903.4 sq. m allocated to residential

 - 95 studios, 87 one-bedrooms, 50 two-bedrooms, and 26 three-bedrooms

 - 387.6 sq. m ground-level retail space

 - Expansion of The 519

 

The proposed expansion of The 519 would create:

 

 - 232.3 sq. m community space on 2nd floor

 - Dedicated lobby off of Church Street

 

Sustainable Urban Living and Accessibility

Reflecting Toronto's ambition to reduce automobile dependency, the development prioritizes bicycle accessibility, offering 223 long-term bicycle parking spaces. This initiative not only supports sustainable transportation but also aligns with the city's broader environmental goals, encouraging residents to embrace greener modes of mobility.

This development hopes to address the pressing demand for housing. This mix aims to cater to various demographics, offering both market-rate and affordable options, thus contributing to the diversification of housing solutions in the city center.

The inclusion of a significant expansion space for The 519 Community Hub is a testament to the project's dedication to community welfare. This space will serve as a vital resource for programs and services, enhancing the support network for the LGBTQ2S+ community and reinforcing the Village's role as a sanctuary of inclusivity.

For construction industry professionals, this development offers rich insights into managing complex urban projects. From navigating heritage preservation challenges to implementing sustainable building practices, the project highlights the importance of multidisciplinary collaboration, innovative design solutions, and community engagement in creating spaces that reflect the evolving urban landscape.

 

DataBid is currently reporting on this project - 68 Wellesley Street East Mixed Use Development Church Wellesley Village - Toronto  (0107020824)

 

TradeTraks Banner

 

Posted by Judy Lamelza

Need the details on a specific Project or Company?
 
See how DataBid can help your company find projects and increase your odds of winning.

 

TRY DATABID TODAY

New call-to-action
Office Hotel Mixed-Use Projects 1080x1920