$17.8 Million for St. David Catholic High School Expansion

$17.8 Million for St. David Catholic High School Expansion

St. David Catholic Secondary School in Waterloo is set to undergo a major transformation following the Ontario government’s announcement of a $17.8 million capital investment to expand the growing campus. The project is part of a broader provincial strategy to address rising student enrolment and modernize learning environments across fast-growing communities.

The announcement was made by representatives from Premier Doug Ford’s government, including Kitchener-Conestoga MPP Mike Harris, who joined local education and municipal leaders to formally confirm funding for the new addition. St. David is one of 12 schools across Ontario selected for expansion funding under the province’s long-term school infrastructure program.

Project Scope and Expansion Program

The expansion will add 18 new classrooms to St. David Catholic Secondary School, creating space for 414 additional students. Current enrolment sits at approximately 1,000 students, meaning the project represents a significant capacity increase for the school and the surrounding community.

According to the Waterloo Catholic District School Board, construction is scheduled to begin in September 2026, with the expanded facilities expected to open for students in Fall 2028. The new addition will support both current growth pressures and long-term demographic trends in Waterloo Region.

Kitchener City News reports that the project will focus on creating modern, flexible classroom environments that align with evolving educational needs. While detailed design plans have not yet been publicly released, similar school expansions typically include new general classrooms, specialized learning spaces, upgraded student services areas, and integrated technology infrastructure.

Design and Construction Considerations

From a construction perspective, the project will require careful integration with the existing school structure. School additions of this scale must maintain uninterrupted operations while construction is underway, which introduces logistical and scheduling challenges for contractors and facility managers.

Key construction priorities will include:

  • Structural connections between new and existing building sections

  • Upgraded mechanical and electrical systems to support increased occupancy

  • Fire safety, accessibility, and security upgrades

  • Energy-efficient building systems aligned with provincial sustainability standards

The addition will also need to accommodate modern teaching methods, including adaptable classroom layouts, digital learning infrastructure, and collaborative spaces.

Workforce and Economic Impact

School construction projects play an important role in supporting local construction employment. The St. David expansion will generate steady demand for skilled trades over an estimated two-year construction period.

Waterloo Catholic District School Board (WCDSB) reports that in addition to construction jobs, the project will support long-term employment in education and facility operations once the new space is operational. Expanded student capacity typically leads to increased staffing needs, including teachers, administrative personnel, custodial staff, and student support services.

Provincial Education Infrastructure Strategy

The St. David project is part of Ontario’s wider commitment to invest $23 billion over the next decade in school construction, renewal, and modernization. This includes funding for new schools, permanent additions, and major renovations across the province.

Over the past two years alone, the province has committed approximately $1.3 billion annually to education capital projects, representing the highest level of school infrastructure funding in Ontario’s history.

For Waterloo Region, the investment reflects sustained population growth driven by immigration, housing development, and economic expansion. Education infrastructure is increasingly viewed as a critical component of long-term community planning.

Local and Board-Level Support

Waterloo Mayor Dorothy McCabe welcomed the investment, emphasizing the importance of aligning public infrastructure with residential growth.

 

"As families continue to choose Waterloo as their home, creating space for every student to learn, grow and thrive is essential. We appreciate the province continuing to invest in Waterloo, a vibrant, future-ready place where investments make a lasting impact."

Waterloo Mayor | Dorothy McCabe

 

The Waterloo Catholic District School Board also highlighted the expansion as a milestone for Catholic education in the region, reinforcing its commitment to student-centred learning environments.

Construction Trades Involved

The St. David expansion will involve a wide range of construction trades and professional services, including:

  • Civil and site servicing contractors

  • Structural concrete and framing crews

  • Steel fabricators and installers

  • Mechanical and HVAC contractors

  • Electrical and low-voltage systems specialists

  • Plumbing and fire protection trades

  • Roofing and building envelope contractors

  • Interior framing, drywall, and finishing trades

  • Flooring, millwork, and glazing specialists

  • Landscaping and site restoration contractors

In addition, professional services will include architects, structural engineers, mechanical engineers, electrical engineers, and construction managers overseeing design coordination and project delivery.

A Long-Term Investment in Community Growth

The St. David Catholic Secondary School expansion illustrates how education infrastructure is becoming a central pillar of Ontario’s broader construction pipeline. Unlike cyclical residential or commercial development, school projects provide stable, publicly funded construction work with predictable timelines and long-term community value.

For contractors, consultants, and suppliers, projects like this represent dependable opportunities in an environment where many private-sector developments remain sensitive to interest rates and market conditions.

Once complete, the expanded school will provide modern facilities for hundreds of additional students while supporting local construction employment and reinforcing Waterloo’s position as one of Ontario’s fastest-growing communities.

As construction begins in 2026, St. David will become another example of how targeted public investment continues to shape the future of Canada’s built environment through education-driven infrastructure.

 

Ontario Project Leads Ad 728x90

 

Posted by Judy Lamelza

Need the details on a specific Project or Company?
 
See how DataBid can help your company find projects and increase your odds of winning.

 

TRY DATABID TODAY

TradeTraks Ad Wide
New call-to-action
DataBid Ad - School University Projects